Detailed Summary Report

Assessment Report: 14055

Property Name Gossan
14055.pdf
Location
NAD 83
56° 35' 29.00'' N, 130° 58' 07.00'' W
56.591389, -130.968611
UTM: Easting 379113, Northing 6273637, Zone 9 (North)
NAD 27
56° 35' 29.42'' N, 130° 58' 01.07'' W
56.591506, -130.966963
UTM: Easting 379210, Northing 6273434, Zone 9 (North)
NTS 104B10W
BCGS 104B056
Mining Divisions Liard
Mining Camp
Title Geological, Trenching, and Diamond Drilling Report on the Gossan 11 Claim
Report Year 1985
Number of Pages 144
Statements of Work n/a
Affidavit Date 1985-11-19
Off Confidential 1986-11-19
Claims GOSSAN 11
General Work Categories Drilling, Geochemical, Geological, Physical
Operators Brinco Mining Limited
Owners
Authors Petersen, David B.
Gorc, D.M.
MINFILE Nos 104B 138
Commodities
Work Done
Drilling Diamond surface 0 hole(s); 0.0 m
Geochemical Sampling/assaying 0 sample(s)
Soil 0 sample(s)
Geological Geological 0.0 ha
Petrographic 0 sample(s)
Physical Topographic/photogrammetric 0.0 ha
Trench 0 trench(es); 0.0 m
Keywords
Related Report(s) 13728, 11332, 11313
File(s) 14055.pdf
Geological Summary
TRIASSIC ANDESITIC FLOWS AND INTERCALATED SILT- STONES HAVE BEEN INTRUDED BY STOCKS AND DYKES OF DIORITIC COMPOSITION - PYRITE IS PERVASIVE AND MASSIVE SULPHIDE HORIZONS HAVE BEEN INTERSECTED NEAR THE ANDESITE - SILTSTONE CONTACT. DRILL TESTING OF THE VARIOUS GEOLOGICAL TARGETS HAS INDICATED THE SULPHIDE-QUARTZ LODE SYSTEMS TO BE OF ECONOMIC POTENTIAL. ASSAYS FROM THE BEST DRILL INTERSECTIONS RETURNED UP TO 1.7% COPPER, 2.3% ZINC, 4 GRAMS/TONNE GOLD AND 222 GRAMS/TONNE SILVER OVER 5.6 METRES.