Detailed Summary Report

Assessment Report: 9530

Property Name Tourm
09530.PDF
Location
NAD 83
49° 05' 54.00'' N, 115° 59' 10.00'' W
49.098333, -115.986111
UTM: Easting 574012, Northing 5438882, Zone 11 (North)
NAD 27
49° 05' 54.10'' N, 115° 59' 06.74'' W
49.098362, -115.985206
UTM: Easting 574080, Northing 5438667, Zone 11 (North)
NTS 082G04W
BCGS 082G001
Mining Divisions Fort Steele
Mining Camp
Title Diamond Drilling, Physical Report of the Tourm Claims
Report Year 1981
Number of Pages 16
Statements of Work n/a
Affidavit Date 1981-06-17
Off Confidential 1982-06-17
Claims Tourm
General Work Categories Drilling, Physical
Operators Gladwin, Kasey
Owners
Authors Wilson, J.R.
MINFILE Nos
Commodities
Work Done
Drilling Diamond surface 1 hole(s); BQ; 154.5 m; No. of maps: 1; Scale(s): 1:2000
Physical Road, local access 17.0 km
Keywords
Related Report(s)
File(s) 09530.PDF
Geological Summary
The bedrock consists of the Aldridge quartzites, siltstones and argillites. Rocks at the drill site are very hard and troumaline-rich. The rocks dip 5-15 degrees northeasterly.