Detailed Summary Report

Assessment Report: 15659

Property Name Dome Mountain
15659.pdf
Location
NAD 83
54° 44' 42.00'' N, 126° 37' 24.00'' W
54.745, -126.623333
UTM: Easting 652980, Northing 6069007, Zone 9 (North)
NAD 27
54° 44' 42.32'' N, 126° 37' 18.88'' W
54.745089, -126.621910
UTM: Easting 653077, Northing 6068805, Zone 9 (North)
NTS 093L10E, 093L15E
BCGS 093L077
Mining Divisions Omineca
Mining Camp
Title Report on Trenching and Diamond Drilling, Dome Mountain, Boulder Creek Zone
Report Year 1986
Number of Pages 158
Statements of Work n/a
Affidavit Date 1986-11-10
Off Confidential 1987-11-10
Claims Cope 2, Grizzly No. 2, Porcupine, Triangle Fr.
General Work Categories Drilling, Geochemical, Physical
Operators Habsburg Resources
Can.-United Min.
Owners Noranda Mining and Exploration Inc.
Authors Helgason, Robert
MINFILE Nos 093L 022
Commodities
Work Done
Drilling Diamond surface 48 hole(s); NQ; 4427.0 m
Geochemical Sampling/assaying 303 sample(s)
Elements Analyzed For Silver, Gold, Copper, Lead, Zinc
Physical Trench 14 trench(es); tren; 244.0 m
Keywords
Related Report(s) 15614, 10684
File(s) 15659.pdf
Geological Summary
The Dome Mountain property consists of mesothermal auriferous quartz veins crosscutting host Lower Jurassic Hazelton Group volcanics. Alteration is a quartz-carbonate-sericite assemblage decreasing in intensity away from the veins. Tonnage at present is 217 727 tonnes grading 15.7 grams per tonne gold and 79.5 grams per tonne silver.