| Property Name |
Marion
24020.pdf
|
| Location |
| NAD 83 |
52° 40' 59.00'' N, 128° 17' 06.00'' W
52.683056, -128.285
UTM: Easting 548334, Northing 5837254, Zone 9 (North)
|
| NAD 27 |
52° 40' 59.47'' N, 128° 17' 00.92'' W
52.683185, -128.283590
UTM: Easting 548431, Northing 5837052, Zone 9 (North)
|
| NTS |
103A09W |
| BCGS |
103A069 |
|
| Mining Divisions |
Skeena |
| Mining Camp |
|
| Title |
Drilling and Geochemical Report on the Marion Project |
| Report Year |
1995 |
| Number of Pages |
50 |
| Statements of Work |
3070105 |
| Affidavit Date |
1995-06-05 |
| Off Confidential |
1996-06-05 |
| Claims |
Mar 7-14, Marion 1 |
| General Work Categories |
Drilling, Geochemical, Physical |
| Operators |
Amcorp Industries Inc.
|
| Owners |
Verdstone Gold Corporation
|
| Authors |
Durfeld, Rudolf Mateo
|
| MINFILE Nos |
103A 002
|
| Commodities |
Silver, Gold, Copper |
| Work Done |
| Drilling |
Diamond surface |
2 hole(s); AX; 45.1 m |
| Geochemical |
Silt |
28 sample(s) |
|
Elements Analyzed For |
Multielement |
|
Soil |
92 sample(s) |
|
Elements Analyzed For |
Multielement |
|
Rock |
21 sample(s) |
|
Elements Analyzed For |
Multielement |
|
Sampling/assaying |
45 sample(s) |
|
Elements Analyzed For |
Multielement |
| Physical |
Line/grid |
2.2 km |
|
| Keywords |
Arsenopyrite, Bornite, Chalcopyrite, Metasediments, Pyrite, Schists, Skarns, Triassic |
| Related Report(s) |
|
| File(s) |
24020.pdf
|
| Geological Summary |
|