Detailed Summary Report

Assessment Report: 28828

Property Name Morrison
28828a.pdf
28828b.pdf
28828c.pdf
Location
NAD 83
55° 11' 33.00'' N, 126° 18' 58.00'' W
55.1925, -126.316111
UTM: Easting 670840, Northing 6119499, Zone 9 (North)
NAD 27
55° 11' 33.29'' N, 126° 18' 52.86'' W
55.192579, -126.314683
UTM: Easting 670936, Northing 6119297, Zone 9 (North)
NTS 093M01W
BCGS 093M019
Mining Divisions Omineca
Mining Camp Babine Porphyry
Title Geotechnical Report on the Morrison Copper/Gold Project
Report Year 2006
Number of Pages 600
Statements of Work 4123153, 5601974, 5613431
Affidavit Date 2007-01-19
Off Confidential 2008-01-19
Claims Erin 1, Hearne 3, Morr 1, Pioneer 2-4, Roli 1
General Work Categories Drilling, Geochemical, Physical
Operators Pacific Booker Minerals Inc.
Owners Pacific Booker Minerals Inc.
Authors Brouwer, Ken J.
Yang, Daniel Y.
MINFILE Nos 093M 007
Commodities Copper
Work Done
Drilling Diamond surface 26 hole(s); HQ; 2105.3 m
Geochemical Metallurgic 161 sample(s)
Physical Pits 35 pit(s)
Keywords Basalts, Biotite feldspar porphyry, Bowser Lake Group, Feasibility studies, Geotechnical engineering, Geotechnical studies, Greywackes, Jurassic, Rock quality, Telkwa Formation, Tuffs, Open pit design
Related Report(s) 27338, 26996, 26773, 26410, 25574, 24736, 20919, 20084, 9298, 2047, 1854, 1611, 1255, 1102
File(s) 28828a.pdf
28828b.pdf
28828c.pdf
Geological Summary